For all NEW or RESUBMITTED Projects/Ship Time Requests, go to https://mfp.us and create a new SME. Some STRs for projects starting in 2022 and beyond have already been moved to Marine Facilities Planning (mfp.us). Check your MFP Science Portal for any projects that might already be moved. If you need to make edits to projects that begin in 2022 and beyond, please contact mfp@unols.org for assistance. Be sure to indicate the Project and STR IDs that you would like to edit. For more information on getting into MFP, see the More Information button below.

  Brine Seep MO  -  2013  -  Endeavor  
  Project Information  
Project Title: NSF/EF 0801741: MO: COLLABORATIVE RESEARCH: A MICROBIAL OBSERVATORY EXAMINING MICROBIAL ABUNDANCE, DIVERSITY, ASSOCIATIONS AND ACTIVITY AT SEAFLOOR BRINE SEEPS Project Status: Submitted
Principal Investigator: Samantha B. Joye, Georgia Project Institution: Georgia
Project ID: 101591 Version #: 4
Date Submitted: 7/3/2008 4:40:00 PM Created By: Samantha B. Joye
Date Last Modified: 1/9/2013 9:13:00 AM URI Serial #: None
Funding Agencies: NSF/BIO/EF - EF 0801741 - Funded
Summary of Field Work: Samples from brine seeps located at water depths between 800 and 3200 m along the continental slope in the Gulf of Mexico will be collected using the ROV JASON during two research cruises. During dives to six study sites, depth profiles of brine will be collected using novel sampling device, the 'brine trapper'. Several 'brine traps' will be collected at each site to obtain samples for microbiological and biogeochemical characterization. Monitoring instrumentation, including in situ rotary cameras and thermister strings will be deployed at the sampling sites for recover about one year later. The monitoring instrumentation will be deployed at two sites on each cruise.
Summary of Facility Requirements: Meeting our project objectives will require two research cruises, preferably upon the RV Knorr, utilizing the ROV JASON. We propose to carry out cruises in 2010 and one in 2011. A short instrument recovery cruise is proposed for 2012 using the RV Pelican For the Knorr cruises, we will need a CTD rosette and hydro van, a cold van and a radioisotope isolation van. We propose
Summary of other requirements and comments: Note: NSF/EF intends to fund this proposal as long as the requested ship time is provided. Lita Proctor is handling the award.
Ship Request Identification
Type of Request: Collaborative Ship Use Request Status: Submitted
Request ID: 1005927 Created By: Samantha B. Joye
Date Last Modified: 1/9/2013 9:13:00 AM Date Submitted: 1/9/2013 9:13:00 AM
Requested Ship, Operating Days and Dates
Year: 2013 Ship/Facility: Endeavor
Optimum Start Date: 7/20/2013 Dates to Avoid: Ideally, these days will be added to the ECOGIG Endeavor cruise since my personnel will already be on the ship.
 
 
Earliest Start Date: 7/1/2013 Multi-Ship Op: No
Latest Start Date: 7/31/2013 Other Ship(s):

Operating Days Needed: Science Days Mob Days De-Mob Days Estimated Transit Days Total Days
3 0 0 3 6
Repeating Cruise?
(within same year)
No Interval:   # of Cruises:  

Description of Repeating cruise requirements:
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations:
The Endeavor is ideally suited to carry out our proposed water column and benthic studies in the Orca Basin. We will be sampling across the chemocline in the deep anoxic basin and collecting sediment cores across a N-S transect in the Orca Basin as a follow up to sampling done in 2010 on this same project.
Work Area for Cruise
Short Description of Op Area
for use in schedules:
Outer Cont Shel
Description of Op Area: Northern Gulf of Mexico
Op Area Size/Dia.: 75
 
  Lat/Long Marsden Grid Navy Op Area
Beginning
NA09 map
Ending
NA09 map
Foreign Clearance and Permitting Requirements
Foreign Clearance Required? No Coastal States:
 Important Info on Foreign Research Clearances  

Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
No If yes, have you applied for the necessary permits through your export control office? No
 Questions about ITAR/EAR regulations?

Comments about foreign clearance requirements or
description of any other special permitting requirements
(e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.)
Port Calls
Requested Start Port Intermediate Port(s) Requested End Port
None None None
Explanation/justification for requested
ports and dates of intermediate stops
or to list additional port stops
 

 Important Info on Working in Foreign Ports

 
Science Party
Chief Scientist: Samantha B. Joye, Georgia
# in Science Party 1 # of different science teams 1 # Marine Technicians to be
provided by ship operator:
(include in science party total)
1
Explanation of Science Party Requirements and Technician Requirements
Instrumentation Requirements That Impact Scheduling Decisions
Unselected Dynamic PositioningUnselected ADCPUnselected MultibeamUnselected Seismic
Selected Dredging/Coring/Large Dia. Trawl WireUnselected Stern A-frameUnselected Fiber Optic (.681)Unselected 0.680 Coax Wire
Unselected SCUBA DivingSelected Radioisotope use - briefly describeUnselected NO Radioisotope use/Natural level workUnselected Other Operator Provided Inst. - Describe
0 PI-Provided Vans - briefly describe Unselected MOCNESS  
Explain Instrumentation or Capability
requirements that could affect choice
of ship in scheduling.

Major Ancillary Facilities (that require coordination of schedules with ship schedule)
Aircraft
Unselected Helicopter Ops (USCG)Unselected Twin OtterUnselected Unmanned Aerial Systems (UAS) 
Autonomous Underwater Vehicle (AUV)
Unselected Other AUVUnselected Sentry  
Coring Facility
Unselected Jumbo Piston CoringUnselected Large Gravity Core Unselected MC800 multicorer w/ MISO camera/telemetryUnselected OSU Coring Facility (MARSSAM)
Unselected Other Large Coring FacilityUnselected WHOI Long Core  
Human Occupied Vehicle (HOV)
Unselected AlvinUnselected Clelia (HBOI)Unselected JSL I & II (HBOI)Unselected Other HOV
Other Facility
Unselected MISO Facility - deep-sea imagingUnselected Other FacilityUnselected Potential Fields Pool Equipment 
Remotely Operated Vehicle (ROV)
Unselected JasonUnselected Other ROV  
Seismic Facility
Unselected Ocean Bottom Seismograph Instrument Center (OBSIC)Unselected Ocean Bottom Seismograph Instrument Pool (OBSIP)Unselected Ocean-Bottom Seismometer Program (UTIG)Unselected Other Seismic/OBS Facility
Unselected PASSCALUnselected Portable MCS groupUnselected Portable MCS/SCS groupUnselected U.S. Geological Survey Ocean Bottom Seismometer Facility (USGS at WHOI)
Towed Underwater Vehicle
Unselected ARGO IIUnselected Hawaii MR1 (HMRG)Unselected IMI12 (HMRG)Unselected IMI120 (HMRG - formerly DSL 120A)
Unselected IMI30 (HMRG)Unselected Other Towed Underwater VehicleUnselected Towfish 
UNOLS Van Pool
Unselected AUV Lab Van #1Unselected Clean Lab VanUnselected Cold Lab VanUnselected General Purpose Lab Van
Selected Radioisotope Lab VanUnselected Wet Lab Van  
UNOLS Winch Pool
Unselected Mooring SpoolerUnselected Portable WinchUnselected Turn Table 
Explain Major Ancillary Facilities
Requirements and list description
and provider for "other" systems.
We need the radioisotope van on board so that we can conduct microbial activity assays in real time.