|
ECOGIG Lander SedTrp
-
2014
-
Pelican
|
|
|
Project Title: |
ECOGIG Lander and Sediment Trap operations |
Project Status: |
Submitted |
Principal Investigator: |
Ray Highsmith, Ole Miss |
Project Institution: |
Ole Miss |
Project ID: |
103851 |
Version #: |
1 |
Date Submitted: |
2/27/2013 12:07:00 PM |
Created By: |
Arne R. Diercks |
Date Last Modified: |
12/9/2013 2:35:00 PM |
URI Serial #: |
None |
Funding Agencies: |
GOMRI - GOMRI Year 3 - Funded |
Summary of Field Work: |
Deployment and recovery Operations for moored instrument arrays including Benthic Landers and Sediment Trap / Camera moorings. Special Instrumentation will include the SSD ROV plus the Site Reconnaissance System. |
Summary of Facility Requirements: |
A-Frame and shipboard instrumentation including , CTD, MIDAS and ADCP. Will need use of fiber optic winch cable supplied by ops team to support SSD and SRC operations. |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1006150 |
Created By: |
Arne R. Diercks |
Date Last Modified: |
2/27/2013 12:07:00 PM |
Date Submitted: |
2/27/2013 12:07:00 PM |
|
Year: |
2014
|
Ship/Facility: |
Pelican
|
Optimum Start Date:
|
5/1/2014 |
Dates to Avoid: |
We need at least a week of separation between AUV and Lander work cruises due to overlap of personnel and preparation / maintenance of equipment |
|
|
|
|
Earliest Start Date: |
4/15/2014 |
Multi-Ship Op: |
No |
Latest Start Date: |
5/15/2014 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
8 |
1 |
1 |
0 |
10 |
Repeating Cruise?
(within same year) |
Yes |
Interval: |
6 |
# of Cruises: |
2 |
|
Description of Repeating cruise requirements: |
We are requesting an early May and a late September cruise for optimal use of moored scientific instrumentation. A total of two cruises are planned for 2014, with the first cruise being funded and the second cruise currently pending the funding. |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
Instrumentation deployments are optimal if cruises can be scheduled to be within a time frame of 6 months to allow for optimal sampling period and avoid loss in time series operations of ongoing deployments. |
|
Short Description of Op Area
for use in schedules: |
Northern GoM |
Description of Op Area: |
GC 600, AT 357, MC 292, MC 118 and adjacent blocks |
Op Area Size/Dia.: |
|
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Cocodrie, LA, USA |
None |
None |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
|
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Ray Highsmith, Ole Miss |
# in Science Party |
12 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
|
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
|
|