                                        Hydrates System Dyna
                                         - 
                                        2014
                                         - 
                                        Pelican
                                     | 
                                    
										
                                         
                                     | 
                                 
                             
                         | 
                    
                    
                    
                        
                            
    
        | 
            Project Title: | 
        
            Temporal Characterization of Hydrates System Dynamics beneath Seafloor Mounds: Integrating Time-Lapse Electrical Resistivity Methods and In Situ Observations of Multiple Oceanographic Parameters | 
        
            Project Status: | 
        
            Submitted | 
     
    
        | 
            Principal Investigator: | 
        
            Carol B. Lutken, CMRET_OLEMISS | 
        
			Project Institution: | 
		
			CMRET_OLEMISS | 
     
    
        | 
            Project ID: | 
        
            103972 | 
        
            Version #: | 
        
            1 | 
     
    
        | 
            Date Submitted: | 
        
            7/17/2013 7:05:00 PM | 
        
            Created By: | 
        
            Carol B. Lutken | 
     
    
        | 
            Date Last Modified: | 
        
            7/17/2013 7:05:00 PM | 
        
			URI Serial #: | 
		
			None | 
     
    
        | 
            Funding Agencies: | 
        
            DOE - FE0010141 - Funded | 
     
    
        | 
            Summary of Field Work: | 
        
            Cruise 1. We will conduct an active resistivity survey across Woolsey Mound, MC118. After confirming which of our predetermined target sites exhibits the greatest resistivity contrast, we will deploy a multisensor lander that includes a 500m resistivity array for a 6-month stay; Cruise 2. We will collect the lander examine the data, rebattery and refurbish instruments onsight and return the lander to an alternative site for another 6 months; Cruise 3. We will collect the lander and examine the data to determine if another deployment is necessary to create a time series, | 
     
    
        | 
            Summary of Facility Requirements: | 
        
            We need a substantial A-Frame to deploy our fiber-optic cable on the Dynacon spool. We need access to the Research reserve at MC118, northern Gulf of Mexico. | 
     
    
        | 
            Summary of other requirements and comments: | 
        
              | 
     
 
                         | 
                    
                    
                    
                        
                            
                                
                                    | 
                                        Type of Request: | 
                                    
                                        Primary Ship Use | 
                                    
                                        Request Status: | 
                                    
                                        Submitted | 
                                 
                                
                                    | 
                                        Request ID: | 
                                    
                                        1006343 | 
                                    
                                       Created By: | 
                                    
                                        Carol B. Lutken | 
                                 
                                
                                    | 
                                        Date Last Modified: | 
                                    
                                        7/17/2013 7:05:00 PM | 
                                    
                                        Date Submitted: | 
                                    
                                         7/17/2013 7:05:00 PM | 
                                 
                             
                         | 
                    
                    
                    
                        
                            
                                
                                    | 
                                        Year: | 
                                    
                                        2014
                                     | 
                                    
                                        Ship/Facility: | 
                                    
                                        Pelican
                                     | 
                                 
                                
                                    | 
                                        Optimum Start Date:
                                     | 
                                    
                                        4/7/2014 | 
                                    
                                        Dates to Avoid: | 
                                    
                                          | 
                                 
                                
                                    |  
                                         | 
                                    
                                         
                                     | 
                                     
                                         | 
                                    
                                         
                                     | 
                                 
                                
                                    | 
                                        Earliest Start Date: | 
                                    
                                        3/31/2014 | 
                                    
                                        Multi-Ship Op: | 
                                    
                                        No | 
                                 
                                
                                    | 
                                        Latest Start Date: | 
                                    
                                        4/24/2014 | 
                                    
                                        Other Ship(s): | 
                                    
                                          | 
                                 
                             
                            
                                
                                    
                                         
                                     | 
                                 
                                
                                    | 
                                        Operating Days Needed: | 
                                    
                                        Science Days | 
                                    
                                        Mob Days | 
                                    
                                        De-Mob Days | 
                                    
                                        Estimated Transit Days | 
                                    
                                        Total Days | 
                                   
                                 
                                
                                    | 
                                        4 | 
                                    
                                        1 | 
                                    
                                        0 | 
                                    
                                        1 | 
                                    
                                        6 | 
                                
                                 
                                
                                    
                                        Repeating Cruise? 
                                        (within same year) | 
                                    
                                        Yes | 
                                    
                                        Interval: | 
                                    
                                        6 months | 
                                    
                                        # of Cruises: | 
                                    
                                        2 | 
                                 
                                
                                    
                                         
                                     | 
                                 
                                
                                    | 
                                        Description of Repeating cruise requirements: | 
                                    
                                        We are collecting time-series data at 6-month intervals. The first cruise is scheduled for September 23-28, 2013 aboard the Pelican. | 
                                 
                                
                                    
                                        Justification/Explanation for ship choice, dates,  
										conflicts, number of days & multi-ship operations: | 
                                    
                                          | 
                                 
                             
                         | 
                    
                    
                    
                        
                             
                                
                                    
									   
									    
										  Short Description of Op Area  
											for use in schedules: | 
										  MC118 | 
										 
									    
										  | Description of Op Area: | 
										  Carbonate-Hydrate Mound at a hydrocarbon seep. | 
										 
										
											| Op Area Size/Dia.: | 
											< 2x2 nmiles | 
										 
									   
									 | 
                                      | 
                                    
	
		|   | 
		Lat/Long | 
		Marsden Grid | 
		Navy Op Area | 
	 
	
		| 
			Beginning
		 | 
		 
			 
				
					28.841667°  N
					/
					 88.463333°  W
					map
				 
			 
			
				
					28°  50.50002'  N
					/
					 88°  27.79998'  W
					map
				 
			 
		 | 
		 | 
		 | 
	 
	
		| 
			Ending
		 | 
		
			 
				
					28.841667°  N
					/
					 88.463333°  W
					map
				 
			 
			
				
					28°  50.50002'  N
					/
					 88°  27.79998'  W
					map
				 
			 
		 | 
		 | 
		 | 
	 
	
	|   | 
	Show Degrees Minutes | 
	  | 
	  | 
 
 
 | 
								 
                             
                         | 
                    
                    
                    
                        
                            
                                
                                    | 
                                        Foreign Clearance Required? | 
                                    
                                        No | 
                                    
                                        Coastal States: 
                                          | 
                                 
                                
									  Important Info on Foreign Research Clearances
 | 
									  | 
                                 
                                
                                 
                                    
                                         
                                        Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?  
                                      | 
                                     
                                        No | 
                                    
                                        If yes, have you applied for the necessary permits through your export control office?
									   |  
									  
									    
                                        No | 
                                      
                                  
									  Questions about ITAR/EAR regulations?
 | 
				
									 
									 
                                
                                        
                                
                                    
                                     
                                        Comments about foreign clearance requirements or  description of any other special permitting requirements  (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) | 
                                    
                                          | 
                                 
                             
                         | 
                    
                    
                    
                        
                            
                                
                                    | 
                                        Requested Start Port | 
                                    
                                        Intermediate Port(s) | 
                                    
                                        Requested End Port | 
                                 
                                
                                    | 
                                        Cocodrie, LA, USA | 
                                    
                                        None | 
                                    
                                        None | 
                                 
                                
                                    
                                        Explanation/justification for requested  ports and dates of intermediate stops  or to list additional port stops | 
                                    
                                        Our fiber-optic cable is wound on a drum at LUMCON. Our ROV/sensors system has been designed to work from the Pelican. | 
                                 
 
                                
									
   Important Info on Working in Foreign Ports
 
  | 
									  | 
                                 
                             
                         | 
                    
                    
                    
                        
                            
                                
                                    | 
                                        Chief Scientist: | 
                                    
                                        Carol B. Lutken, CMRET_OLEMISS | 
                                 
                                
                                    | 
                                        # in Science Party | 
                                    
                                        12 | 
                                    
                                        # of different science teams | 
                                    
                                        
                                            1 | 
                                    
                                        # Marine Technicians to be  
										 provided by ship operator: 
                                         (include in science party total) 
                                     | 
                                    
                                        1 | 
                                 
                                
                                    | 
                                        Explanation of Science Party Requirements and Technician Requirements | 
                                    
                                          | 
                                 
                             
                         | 
                    
                    
                    
                        
							
	
		  Dynamic Positioning |   ADCP |   Multibeam |   Seismic | 
	 
		  Dredging/Coring/Large Dia. Trawl Wire |   Stern A-frame |   Fiber Optic (.681) |   0.680 Coax Wire | 
	 
		  SCUBA Diving |   Radioisotope use - briefly describe |   NO Radioisotope use/Natural level work |   Other Operator Provided Inst. - Describe | 
	 
		| 0 PI-Provided Vans - briefly describe  |   MOCNESS |   |   | 
	 
 
                         | 
                    
                    
                        
                            
                                
                                    
                                        Explain Instrumentation or Capability  requirements that could affect choice  of ship in scheduling. | 
                                    
                                         
                                            resistivity array We will provide our own small ROV, site reconnaissance camera and Fiber-optic cable 
                                     | 
                                 
                             
                         | 
                    
                    
                    
                        | 
							
                         | 
                    
                    
                        
                            
                                
                                    
                                        Explain Major Ancillary Facilities  Requirements and list description  and provider for "other" systems. | 
                                    
                                          | 
                                 
                             
                         |