Ship Request

STR Management has moved to MFP

The US Academic Research Fleet is moving to Marine Facilities Planning (MFP) for scheduling initially and eventually cruise planning.

For all NEW or RESUBMITTED Projects/Ship Time Requests, go to https://mfp.us and create a new SME. Some STRs for projects starting in 2022 and beyond have already been moved to Marine Facilities Planning (mfp.us). Check your MFP Science Portal for any projects that might already be moved. If you need to make edits to projects that begin in 2022 and beyond, please contact mfp@unols.org for assistance. Be sure to indicate the Project and STR IDs that you would like to edit. For more information on getting into MFP, see the More Information button below.

  Lagrangian Study  -  2015  -  Pelican  
  Project Information  
Project Title: A Lagrangian Approach to Study the Gulf of Mexico's Deep Circulation Project Status: Submitted
Principal Investigator: James J. Singer, leidos Project Institution: leidos
Project ID: 104364 Version #: 1
Date Submitted: 5/1/2014 3:01:00 PM Created By: James J. Singer
Date Last Modified: 5/1/2014 3:01:00 PM URI Serial #: None
Funding Agencies: BOEM - M10PC00112 - Funded
Summary of Field Work: Three sound source moorings were deployed in US waters and one in Mexican waters in the Gulf of Mexico in July/August 2011. Since then, APEX and RAFOS drifters have been deployed to study ocean circulation at different levels in the water column. The sound source moorings are scheduled for recovery in May/June 2015.
Summary of Facility Requirements: 7-8 days of R/V PELICAN with stern A-frame, crane and room on trawl winch drum to handle 5000 m 3/16" jacketed (1/4" diameter) wire rope.
Summary of other requirements and comments:  
Ship Request Identification
Type of Request: Primary Ship Use Request Status: Submitted
Request ID: 1006970 Created By: James J. Singer
Date Last Modified: 5/1/2014 3:01:00 PM Date Submitted: 5/1/2014 3:01:00 PM
Requested Ship, Operating Days and Dates
Year: 2015 Ship/Facility: Pelican
Optimum Start Date: 5/12/2015 Dates to Avoid: Trying to have cruise start date in this window to have sufficient time to get ready for another cruise scheduled for 11-23 June 2015. Also, we are within two months of the manufacturer's stated endurance for the releases on the moorings.
 
 
Earliest Start Date: 5/5/2015 Multi-Ship Op: No
Latest Start Date: 5/12/2015 Other Ship(s):

Operating Days Needed: Science Days Mob Days De-Mob Days Estimated Transit Days Total Days
1 0 0 6 7
Repeating Cruise?
(within same year)
No Interval:   # of Cruises:  

Description of Repeating cruise requirements:
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations:
We mobilized and deployed the sound source moorings from the R/V PELICAN in July 2011 and LUMCON is strategically located in the center of the offshore study area where the sound sources were deployed. Ship's crew is very familiar with these type efforts and they and the scientific party have worked together for many years. Total time at sea is expected to be six days, including steaming time and time on station for the three mooring recoveries. Mobilization and demobilization on either end of the cruise should not be more than a few hours.
Work Area for Cruise
Short Description of Op Area
for use in schedules:
N and E GoM
Description of Op Area: 93W to 85W
25N to 29N
Op Area Size/Dia.:  
 
  Lat/Long Marsden Grid Navy Op Area
Beginning
29.167° N / 90.667° W map
82 map
NA09 map
Ending
29.167° N / 90.667° W map
82 map
NA09 map
  Show Degrees Minutes    
Foreign Clearance and Permitting Requirements
Foreign Clearance Required? No Coastal States:
 Important Info on Foreign Research Clearances  

Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
No If yes, have you applied for the necessary permits through your export control office? No
 Questions about ITAR/EAR regulations?

Comments about foreign clearance requirements or
description of any other special permitting requirements
(e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.)
Port Calls
Requested Start Port Intermediate Port(s) Requested End Port
Cocodrie, LA, USA None Cocodrie, LA, USA
Explanation/justification for requested
ports and dates of intermediate stops
or to list additional port stops
 

 Important Info on Working in Foreign Ports

 
Science Party
Chief Scientist: James J. Singer, leidos
# in Science Party 3 # of different science teams 1 # Marine Technicians to be
provided by ship operator:
(include in science party total)
1
Explanation of Science Party Requirements and Technician Requirements Support Deck operations: Mooring Recoveries
Instrumentation Requirements That Impact Scheduling Decisions
Unselected Dynamic PositioningUnselected ADCPUnselected MultibeamUnselected Seismic
Unselected Dredging/Coring/Large Dia. Trawl WireUnselected Stern A-frameUnselected Fiber Optic (.681)Unselected 0.680 Coax Wire
Unselected SCUBA DivingUnselected Radioisotope use - briefly describeUnselected NO Radioisotope use/Natural level workUnselected Other Operator Provided Inst. - Describe
0 PI-Provided Vans - briefly describe Unselected MOCNESS  
Explain Instrumentation or Capability
requirements that could affect choice
of ship in scheduling.

Need A-frame, Crane and Trawl Winch

Major Ancillary Facilities (that require coordination of schedules with ship schedule)
Aircraft
Unselected Helicopter Ops (USCG)Unselected Twin OtterUnselected Unmanned Aerial Systems (UAS) 
Autonomous Underwater Vehicle (AUV)
Unselected Other AUVUnselected Sentry  
Coring Facility
Unselected Jumbo Piston CoringUnselected Large Gravity Core Unselected MC800 multicorer w/ MISO camera/telemetryUnselected OSU Coring Facility (MARSSAM)
Unselected Other Large Coring FacilityUnselected WHOI Long Core  
Human Occupied Vehicle (HOV)
Unselected AlvinUnselected Clelia (HBOI)Unselected JSL I & II (HBOI)Unselected Other HOV
Other Facility
Unselected MISO Facility - deep-sea imagingUnselected Other FacilityUnselected Potential Fields Pool Equipment 
Remotely Operated Vehicle (ROV)
Unselected JasonUnselected Other ROV  
Seismic Facility
Unselected Ocean Bottom Seismograph Instrument Center (OBSIC)Unselected Ocean Bottom Seismograph Instrument Pool (OBSIP)Unselected Ocean-Bottom Seismometer Program (UTIG)Unselected Other Seismic/OBS Facility
Unselected PASSCALUnselected Portable MCS groupUnselected Portable MCS/SCS groupUnselected U.S. Geological Survey Ocean Bottom Seismometer Facility (USGS at WHOI)
Towed Underwater Vehicle
Unselected ARGO IIUnselected Hawaii MR1 (HMRG)Unselected IMI12 (HMRG)Unselected IMI120 (HMRG - formerly DSL 120A)
Unselected IMI30 (HMRG)Unselected Other Towed Underwater VehicleUnselected Towfish 
UNOLS Van Pool
Unselected AUV Lab Van #1Unselected Clean Lab VanUnselected Cold Lab VanUnselected General Purpose Lab Van
Unselected Radioisotope Lab VanUnselected Wet Lab Van  
UNOLS Winch Pool
Unselected Mooring SpoolerUnselected Portable WinchUnselected Turn Table 
Explain Major Ancillary Facilities
Requirements and list description
and provider for "other" systems.

Expand request schedules  Associated Schedules

Expand request history Ship Request History