Ship Request

STR Management has moved to MFP

The US Academic Research Fleet is moving to Marine Facilities Planning (MFP) for scheduling initially and eventually cruise planning.

For all NEW or RESUBMITTED Projects/Ship Time Requests, go to https://mfp.us and create a new SME. Some STRs for projects starting in 2022 and beyond have already been moved to Marine Facilities Planning (mfp.us). Check your MFP Science Portal for any projects that might already be moved. If you need to make edits to projects that begin in 2022 and beyond, please contact mfp@unols.org for assistance. Be sure to indicate the Project and STR IDs that you would like to edit. For more information on getting into MFP, see the More Information button below.

  Deep carbon pathways  -  2015  -  Pelican  
  Project Information  
Project Title: Carbon fixation pathways from the deep marine biosphere Project Status: Submitted
Principal Investigator: Leila J. Hamdan, USM, Hattiesburg Project Institution: NRL DC
Project ID: 104422 Version #: 2
Date Submitted: 7/3/2014 4:21:00 PM Created By: Leila J. Hamdan
Date Last Modified: 7/27/2015 7:37:00 PM URI Serial #: None
Funding Agencies: NAVY/NRL - NONE - Funded
Summary of Field Work: This work will consist of a single multi-coring and CTD cruise in the northern Gulf of Mexico. Sediment samples will be collected from a safe working distance from wooden and metal shipwrecks. Sediments will be used it isolate, culture and identify microorganisms from the dark biosphere which contain novel and enhanced pathways for dark carbon fixation.
Summary of Facility Requirements: CTD - Rosette, Multi-Corer (MC800).
Summary of other requirements and comments: A navigation beacon for the Multi-corer is desired to confirm and maintain safety while working in proximity to shipwrecks.
Ship Request Identification
Type of Request: Primary Ship Use Request Status: Submitted
Request ID: 1007082 Created By: Leila J. Hamdan
Date Last Modified: 7/27/2015 7:37:00 PM Date Submitted: 7/3/2014 4:21:00 PM
Requested Ship, Operating Days and Dates
Year: 2015 Ship/Facility: Pelican
Optimum Start Date: 6/15/2015 Dates to Avoid:  
 
 
Earliest Start Date: 5/15/2014 Multi-Ship Op: No
Latest Start Date: 10/15/2014 Other Ship(s):

Operating Days Needed: Science Days Mob Days De-Mob Days Estimated Transit Days Total Days
5 1 1 0 7
Repeating Cruise?
(within same year)
No Interval:   # of Cruises:  

Description of Repeating cruise requirements:
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations:
Ship choice is based on the field operating location, dates are flexible, but must occur during summer for collaborator flexibility, number of days are based on the number of anticipated sites.
Work Area for Cruise
Short Description of Op Area
for use in schedules:
Northern GOM
Description of Op Area: Northern Gulf of Mexico
Op Area Size/Dia.:  
 
  Lat/Long Marsden Grid Navy Op Area
Beginning
Ending
Foreign Clearance and Permitting Requirements
Foreign Clearance Required? No Coastal States:
 Important Info on Foreign Research Clearances  

Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
No If yes, have you applied for the necessary permits through your export control office? No
 Questions about ITAR/EAR regulations?

Comments about foreign clearance requirements or
description of any other special permitting requirements
(e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.)
Port Calls
Requested Start Port Intermediate Port(s) Requested End Port
Cocodrie, LA, USA None Cocodrie, LA, USA
Explanation/justification for requested
ports and dates of intermediate stops
or to list additional port stops
 

 Important Info on Working in Foreign Ports

 
Science Party
Chief Scientist: Leila J. Hamdan, USM, Hattiesburg
# in Science Party 14 # of different science teams 1 # Marine Technicians to be
provided by ship operator:
(include in science party total)
1
Explanation of Science Party Requirements and Technician Requirements
Instrumentation Requirements That Impact Scheduling Decisions
Unselected Dynamic PositioningUnselected ADCPUnselected MultibeamUnselected Seismic
Selected Dredging/Coring/Large Dia. Trawl WireUnselected Stern A-frameUnselected Fiber Optic (.681)Unselected 0.680 Coax Wire
Unselected SCUBA DivingSelected Radioisotope use - briefly describeUnselected NO Radioisotope use/Natural level workUnselected Other Operator Provided Inst. - Describe
0 PI-Provided Vans - briefly describe Unselected MOCNESS  
Explain Instrumentation or Capability
requirements that could affect choice
of ship in scheduling.

Major Ancillary Facilities (that require coordination of schedules with ship schedule)
Aircraft
Unselected Helicopter Ops (USCG)Unselected Twin OtterUnselected Unmanned Aerial Systems (UAS) 
Autonomous Underwater Vehicle (AUV)
Unselected Other AUVUnselected Sentry  
Coring Facility
Unselected Jumbo Piston CoringUnselected Large Gravity Core Unselected MC800 multicorer w/ MISO camera/telemetryUnselected OSU Coring Facility (MARSSAM)
Unselected Other Large Coring FacilityUnselected WHOI Long Core  
Human Occupied Vehicle (HOV)
Unselected AlvinUnselected Clelia (HBOI)Unselected JSL I & II (HBOI)Unselected Other HOV
Other Facility
Unselected MISO Facility - deep-sea imagingUnselected Other FacilityUnselected Potential Fields Pool Equipment 
Remotely Operated Vehicle (ROV)
Unselected JasonUnselected Other ROV  
Seismic Facility
Unselected Ocean Bottom Seismograph Instrument Center (OBSIC)Unselected Ocean Bottom Seismograph Instrument Pool (OBSIP)Unselected Ocean-Bottom Seismometer Program (UTIG)Unselected Other Seismic/OBS Facility
Unselected PASSCALUnselected Portable MCS groupUnselected Portable MCS/SCS groupUnselected U.S. Geological Survey Ocean Bottom Seismometer Facility (USGS at WHOI)
Towed Underwater Vehicle
Unselected ARGO IIUnselected Hawaii MR1 (HMRG)Unselected IMI12 (HMRG)Unselected IMI120 (HMRG - formerly DSL 120A)
Unselected IMI30 (HMRG)Unselected Other Towed Underwater VehicleUnselected Towfish 
UNOLS Van Pool
Unselected AUV Lab Van #1Unselected Clean Lab VanUnselected Cold Lab VanUnselected General Purpose Lab Van
Selected Radioisotope Lab VanUnselected Wet Lab Van  
UNOLS Winch Pool
Unselected Mooring SpoolerUnselected Portable WinchUnselected Turn Table 
Explain Major Ancillary Facilities
Requirements and list description
and provider for "other" systems.
Radioisotope van required for in-situ metabolic measurements.

Expand request schedules  Associated Schedules

Expand request history Ship Request History