Oregon Profile ASCPR
-
2016
-
Sikuliaq
|
|
|
Project Title: |
Collaborative Research: Constraints on Interseismic Deformation Offshore Oregon from Calibrated Continuous Pressure Records |
Project Status: |
Submitted |
Principal Investigator: |
William S. Wilcock, UW |
Project Institution: |
UW |
Project ID: |
104963 |
Version #: |
5 |
Date Submitted: |
8/6/2015 4:50:00 PM |
Created By: |
William S. Wilcock |
Date Last Modified: |
8/30/2016 3:24:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NSF/OCE/MGG - 1558477 - Funded |
Summary of Field Work: |
This work will comprise ROV measurements in two successive years to obtain calibrated absolute pressure measurements and data download from continuous bottom pressure recorders at 6 seafloor benchmarks that form a profile across the Cascadia subduction zone off central Oregon. |
Summary of Facility Requirements: |
Requires a Global class vessel with DP capability and a remotely operated vehicle |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1007969 |
Created By: |
William S. Wilcock |
Date Last Modified: |
8/30/2016 3:24:00 PM |
Date Submitted: |
8/6/2015 4:50:00 PM |
|
Year: |
2016
|
Ship/Facility: |
Sikuliaq
|
Optimum Start Date:
|
8/1/2016 |
Dates to Avoid: |
Ship time request to reflect scheduling on Sikuliaq as add-on to Zumberge San Diego - Esquimalt Leg in very late May / early June |
|
|
|
|
Earliest Start Date: |
5/15/2016 |
Multi-Ship Op: |
No |
Latest Start Date: |
9/30/2016 |
Other Ship(s): |
N/A |
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
4 |
0 |
0 |
0 |
4 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
N/A |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
N/A |
|
Short Description of Op Area
for use in schedules: |
Oregon Margin |
Description of Op Area: |
Profile extending from shelf to abyssal plain (OOI Slope Base site) across the central Oregon margin |
Op Area Size/Dia.: |
1 |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
44° 30' N
/
125° 24' W
map
|
|
|
Ending
|
44° 24' N
/
124° 24' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
None |
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
San Diego, CA, USA |
None, , None, |
Esquimalt Harbor, Vancouver, Canada |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
Requesting add on to scheduled Zumberge cruise on the Sikuliaq. Need to add 4 days on site on margin off central Newport in same area as Zumberge's existing 2 days |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
William S. Wilcock, UW |
# in Science Party |
8 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
ROV capable vessel |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
Nothing to add
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
Jason |
|