CalCOFI SVC
-
2016
-
Sally Ride
|
|
|
Project Title: |
CalCOFI Science Verification Cruise |
Project Status: |
Submitted |
Principal Investigator: |
David M. Checkley, SIO |
Project Institution: |
SIO |
Project ID: |
105349 |
Version #: |
1 |
Date Submitted: |
6/10/2016 3:08:00 PM |
Created By: |
David M. Checkley |
Date Last Modified: |
6/10/2016 3:08:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NAVY/ONR - NONE - Funded |
Summary of Field Work: |
Standard CalCOFI underway and station work will be performed to verify performance. Underway: T, S, chl a fluorescence, ADCP, EK80; possibly passive acoustics and bird and mammal observations. On station: CTD cast, net tows (bongo-LOPC, Manta and CalVET) The duration of underway and number of stations TBD. |
Summary of Facility Requirements: |
CTD winch with standard 0.322" wire (CalCOFI CTD to be used) Hydrographic winch with non-conducting e.g., 0.25" wire for nets ADCP, EK80, underway T, S, chl a fluoresence May ask for van for radiation work but unlikely |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1008596 |
Created By: |
David M. Checkley |
Date Last Modified: |
6/10/2016 3:08:00 PM |
Date Submitted: |
6/10/2016 3:08:00 PM |
|
Year: |
2016
|
Ship/Facility: |
Sally Ride
|
Optimum Start Date:
|
9/28/2016 |
Dates to Avoid: |
These dates have been provided to CalCOFI. |
|
|
|
|
Earliest Start Date: |
9/1/2016 |
Multi-Ship Op: |
No |
Latest Start Date: |
10/31/2016 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
5 |
2 |
1 |
0 |
8 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
|
|
Short Description of Op Area
for use in schedules: |
So Cal |
Description of Op Area: |
San Deigo to Point Conception out 300nm maximum. |
Op Area Size/Dia.: |
250nm x 300nm |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
32° 42' N
/
117° 12' W
map
|
|
|
Ending
|
32° 42' N
/
117° 12' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
San Diego, CA, USA |
None, , None, |
San Diego, CA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
|
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
James R. Wilkinson, SIO |
# in Science Party |
10 |
# of different science teams |
2 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
2 |
Explanation of Science Party Requirements and Technician Requirements |
CalCOFI and ancillary program staff ~ 10 Ancillary programs may include Stephen Birch Aquarium (1-2 persons) We have been advised that 2 techs will be provided by SIO |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
1 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
Uncertain at this time if radioisotopes will be used. If so, would be 14C for on-deck incubation and measurement of primary productivity Radioactivity Van TBD
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
UNOLS Rad Van use TBD. |
|