Ship Request

STR Management has moved to MFP

The US Academic Research Fleet is moving to Marine Facilities Planning (MFP) for scheduling initially and eventually cruise planning.

For all NEW or RESUBMITTED Projects/Ship Time Requests, go to https://mfp.us and create a new SME. Some STRs for projects starting in 2022 and beyond have already been moved to Marine Facilities Planning (mfp.us). Check your MFP Science Portal for any projects that might already be moved. If you need to make edits to projects that begin in 2022 and beyond, please contact mfp@unols.org for assistance. Be sure to indicate the Project and STR IDs that you would like to edit. For more information on getting into MFP, see the More Information button below.

  PSIEX17  -  2017  -  Sally Ride  
  Project Information  
Project Title: Point Sal Inner Shelf Experiment 2017 (PSIEX17) Project Status: Submitted
Principal Investigator: John Colosi, NPS Project Institution: NPS
Project ID: 105355 Version #: 6
Date Submitted: 6/24/2016 10:40:00 AM Created By: John Colosi
Date Last Modified: 9/19/2016 3:45:00 PM URI Serial #: None
Funding Agencies: NAVY/ONR - NONE - Funded
Summary of Field Work: Deploy 3 quadpods (bottom landers), multiple ADCPs, and multiple thermistor moorings on the inner continental shelf off Vandenberg AFB. Water depths of interest are 20-100 m.
Summary of Facility Requirements: Dynamic positioning, A frame for deployment of quad pods and small moorings, CTD, and ship's radar for looking at waves.
Summary of other requirements and comments:  
Ship Request Identification
Type of Request: Primary Ship Use Request Status: Submitted
Request ID: 1008610 Created By: John Colosi
Date Last Modified: 9/19/2016 3:45:00 PM Date Submitted: 6/24/2016 10:40:00 AM
Requested Ship, Operating Days and Dates
Year: 2017 Ship/Facility: Sally Ride
Optimum Start Date: 8/28/2017 Dates to Avoid: none
 
 
Earliest Start Date: 8/14/2017 Multi-Ship Op: No
Latest Start Date: 9/14/2017 Other Ship(s): none

Operating Days Needed: Science Days Mob Days De-Mob Days Estimated Transit Days Total Days
15 3 1 2 21
Repeating Cruise?
(within same year)
No Interval:   # of Cruises:  

Description of Repeating cruise requirements: none
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations:
Science objectives are to observe the summer/fall seasonal transition.
Ship needs to be capable of deploying large quad-pods (large A-frame) as well as 45 shallow water moorings.
Work Area for Cruise
Short Description of Op Area
for use in schedules:
Vandenberg
Description of Op Area: Inner Continental Shelf, water depths of 20 to 100 m.
Op Area Size/Dia.: 40
 
  Lat/Long Marsden Grid Navy Op Area
Beginning
35.1° N / 120.66° W map
121 map
NP09 map
Ending
34.7° N / 120.66° W map
121 map
NP09 map
  Show Degrees Minutes    
Foreign Clearance and Permitting Requirements
Foreign Clearance Required? No Coastal States:
 Important Info on Foreign Research Clearances  

Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
No If yes, have you applied for the necessary permits through your export control office? No
 Questions about ITAR/EAR regulations?

Comments about foreign clearance requirements or
description of any other special permitting requirements
(e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.)
none
Port Calls
Requested Start Port Intermediate Port(s) Requested End Port
San Diego, CA, USA San Diego, CA, USA, San Diego, CA, USA San Diego, CA, USA
Explanation/justification for requested
ports and dates of intermediate stops
or to list additional port stops
No intermediate port needed

 Important Info on Working in Foreign Ports

 
Science Party
Chief Scientist: John Colosi, NPS
# in Science Party 14 # of different science teams 5 # Marine Technicians to be
provided by ship operator:
(include in science party total)
1
Explanation of Science Party Requirements and Technician Requirements NPS mooring team, OSU mooring team, SIO mooring Team, NRL quadpod team, SIO radar team.
Instrumentation Requirements That Impact Scheduling Decisions
Selected Dynamic PositioningUnselected ADCPUnselected MultibeamUnselected Seismic
Unselected Dredging/Coring/Large Dia. Trawl WireUnselected Stern A-frameUnselected Fiber Optic (.681)Unselected 0.680 Coax Wire
Unselected SCUBA DivingUnselected Radioisotope use - briefly describeUnselected NO Radioisotope use/Natural level workUnselected Other Operator Provided Inst. - Describe
0 PI-Provided Vans - briefly describe Unselected MOCNESS  
Explain Instrumentation or Capability
requirements that could affect choice
of ship in scheduling.

Precise ship locations needed for shallow water mooring deployment.
Closely spaced ADCP and Temperature moorings.

Major Ancillary Facilities (that require coordination of schedules with ship schedule)
Aircraft
Unselected Helicopter Ops (USCG)Unselected Twin OtterUnselected Unmanned Aerial Systems (UAS) 
Autonomous Underwater Vehicle (AUV)
Unselected Other AUVUnselected Sentry  
Coring Facility
Unselected Jumbo Piston CoringUnselected Large Gravity Core Unselected MC800 multicorer w/ MISO camera/telemetryUnselected OSU Coring Facility (MARSSAM)
Unselected Other Large Coring FacilityUnselected WHOI Long Core  
Human Occupied Vehicle (HOV)
Unselected AlvinUnselected Clelia (HBOI)Unselected JSL I & II (HBOI)Unselected Other HOV
Other Facility
Unselected MISO Facility - deep-sea imagingUnselected Other FacilityUnselected Potential Fields Pool Equipment 
Remotely Operated Vehicle (ROV)
Unselected JasonUnselected Other ROV  
Seismic Facility
Unselected Ocean Bottom Seismograph Instrument Center (OBSIC)Unselected Ocean Bottom Seismograph Instrument Pool (OBSIP)Unselected Ocean-Bottom Seismometer Program (UTIG)Unselected Other Seismic/OBS Facility
Unselected PASSCALUnselected Portable MCS groupUnselected Portable MCS/SCS groupUnselected U.S. Geological Survey Ocean Bottom Seismometer Facility (USGS at WHOI)
Towed Underwater Vehicle
Unselected ARGO IIUnselected Hawaii MR1 (HMRG)Unselected IMI12 (HMRG)Unselected IMI120 (HMRG - formerly DSL 120A)
Unselected IMI30 (HMRG)Unselected Other Towed Underwater VehicleUnselected Towfish 
UNOLS Van Pool
Unselected AUV Lab Van #1Unselected Clean Lab VanUnselected Cold Lab VanUnselected General Purpose Lab Van
Unselected Radioisotope Lab VanUnselected Wet Lab Van  
UNOLS Winch Pool
Unselected Mooring SpoolerUnselected Portable WinchUnselected Turn Table 
Explain Major Ancillary Facilities
Requirements and list description
and provider for "other" systems.
N/A, though small boat operations may be needed.

Expand request schedules  Associated Schedules

Expand request history Ship Request History