Ship Request

STR Management has moved to MFP

The US Academic Research Fleet is moving to Marine Facilities Planning (MFP) for scheduling initially and eventually cruise planning.

For all NEW or RESUBMITTED Projects/Ship Time Requests, go to https://mfp.us and create a new SME. Some STRs for projects starting in 2022 and beyond have already been moved to Marine Facilities Planning (mfp.us). Check your MFP Science Portal for any projects that might already be moved. If you need to make edits to projects that begin in 2022 and beyond, please contact mfp@unols.org for assistance. Be sure to indicate the Project and STR IDs that you would like to edit. For more information on getting into MFP, see the More Information button below.

  OMZ expansions  -  2018  -  Thomas G. Thompson  
  Project Information  
Project Title: Permanence of the recent expansions of the OMZ and denitrification regimes in the eastern tropical North Pacific Project Status: Submitted
Principal Investigator: Allan Devol, UW Project Institution: UW
Project ID: 105417 Version #: 1
Date Submitted: 8/1/2016 4:44:00 PM Created By: Allan Devol
Date Last Modified: 12/8/2016 11:06:00 AM URI Serial #: None
Funding Agencies: NSF/OCE/CO - 1657958 - Funded
Summary of Field Work: Add two days ship time to each of two funded cruises of NSF grant 1542240 (Rocap, Devol, Keil and Deutsch PIs) to utilize transit to sample a section along 110 degrees West between the tip of Baja to 14 degrees North. We will sample ~18 stations for nutrients and oxygen to see it the recent expansion of the OMZ and denitrification regimes are persistent. The two cruises to which we wish to add the shiptime are those requested for August 2017 and May 2018.
Summary of Facility Requirements: CTD
Summary of other requirements and comments: NONE
Ship Request Identification
Type of Request: Primary Ship Use Request Status: Submitted
Request ID: 1008765 Created By: Allan Devol
Date Last Modified: 8/1/2016 4:44:00 PM Date Submitted: 8/1/2016 4:44:00 PM
Requested Ship, Operating Days and Dates
Year: 2018 Ship/Facility: Thomas G. Thompson
Optimum Start Date: 5/15/2018 Dates to Avoid: requested ship time to be added to that allready funded by NSF 1542240
 
 
Earliest Start Date: 5/1/2015 Multi-Ship Op: No
Latest Start Date: 5/31/2016 Other Ship(s):

Operating Days Needed: Science Days Mob Days De-Mob Days Estimated Transit Days Total Days
2 0 0 0 2
Repeating Cruise?
(within same year)
No Interval:   # of Cruises:  

Description of Repeating cruise requirements:
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations:
Work Area for Cruise
Short Description of Op Area
for use in schedules:
np13
Description of Op Area: eastern tropical North Pacific along 110 W, between 22.5 N and 14N
Op Area Size/Dia.: 600
 
  Lat/Long Marsden Grid Navy Op Area
Beginning
22.5° N / 110° W map
84 map
NP13 map
Ending
15° N / 110° W map
48 map
NP13 map
  Show Degrees Minutes    
Foreign Clearance and Permitting Requirements
Foreign Clearance Required? Yes Coastal States:

Mexico
 Important Info on Foreign Research Clearances  

Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
No If yes, have you applied for the necessary permits through your export control office? No
 Questions about ITAR/EAR regulations?

Comments about foreign clearance requirements or
description of any other special permitting requirements
(e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.)
Port Calls
Requested Start Port Intermediate Port(s) Requested End Port
San Diego, CA, USA None, , None, Manzanillo, Mexico
Explanation/justification for requested
ports and dates of intermediate stops
or to list additional port stops
Ports will be coordinated with grant 1542240.

 Important Info on Working in Foreign Ports

 
Science Party
Chief Scientist: Allan Devol, UW
# in Science Party 3 # of different science teams 5 # Marine Technicians to be
provided by ship operator:
(include in science party total)
2
Explanation of Science Party Requirements and Technician Requirements This is the party size for this request. The entire science party for the NSF grant 1542240 will be onboard also.
Instrumentation Requirements That Impact Scheduling Decisions
Unselected Dynamic PositioningUnselected ADCPUnselected MultibeamUnselected Seismic
Unselected Dredging/Coring/Large Dia. Trawl WireUnselected Stern A-frameUnselected Fiber Optic (.681)Unselected 0.680 Coax Wire
Unselected SCUBA DivingUnselected Radioisotope use - briefly describeUnselected NO Radioisotope use/Natural level workUnselected Other Operator Provided Inst. - Describe
0 PI-Provided Vans - briefly describe Unselected MOCNESS  
Explain Instrumentation or Capability
requirements that could affect choice
of ship in scheduling.

Major Ancillary Facilities (that require coordination of schedules with ship schedule)
Aircraft
Unselected Helicopter Ops (USCG)Unselected Twin OtterUnselected Unmanned Aerial Systems (UAS) 
Autonomous Underwater Vehicle (AUV)
Unselected Other AUVUnselected Sentry  
Coring Facility
Unselected Jumbo Piston CoringUnselected Large Gravity Core Unselected MC800 multicorer w/ MISO camera/telemetryUnselected OSU Coring Facility (MARSSAM)
Unselected Other Large Coring FacilityUnselected WHOI Long Core  
Human Occupied Vehicle (HOV)
Unselected AlvinUnselected Clelia (HBOI)Unselected JSL I & II (HBOI)Unselected Other HOV
Other Facility
Unselected MISO Facility - deep-sea imagingUnselected Other FacilityUnselected Potential Fields Pool Equipment 
Remotely Operated Vehicle (ROV)
Unselected JasonUnselected Other ROV  
Seismic Facility
Unselected Ocean Bottom Seismograph Instrument Center (OBSIC)Unselected Ocean Bottom Seismograph Instrument Pool (OBSIP)Unselected Ocean-Bottom Seismometer Program (UTIG)Unselected Other Seismic/OBS Facility
Unselected PASSCALUnselected Portable MCS groupUnselected Portable MCS/SCS groupUnselected U.S. Geological Survey Ocean Bottom Seismometer Facility (USGS at WHOI)
Towed Underwater Vehicle
Unselected ARGO IIUnselected Hawaii MR1 (HMRG)Unselected IMI12 (HMRG)Unselected IMI120 (HMRG - formerly DSL 120A)
Unselected IMI30 (HMRG)Unselected Other Towed Underwater VehicleUnselected Towfish 
UNOLS Van Pool
Unselected AUV Lab Van #1Unselected Clean Lab VanUnselected Cold Lab VanUnselected General Purpose Lab Van
Unselected Radioisotope Lab VanUnselected Wet Lab Van  
UNOLS Winch Pool
Unselected Mooring SpoolerUnselected Portable WinchUnselected Turn Table 
Explain Major Ancillary Facilities
Requirements and list description
and provider for "other" systems.

Expand request schedules  Associated Schedules

Expand request history Ship Request History