|
SVC-multi-discipline
-
2017
-
Sally Ride
|
|
|
Project Title: |
Science Verification Cruise - Multi-disciplinary |
Project Status: |
Submitted |
Principal Investigator: |
Simone Baumann-Pickering, SIO |
Project Institution: |
SIO |
Project ID: |
105508 |
Version #: |
2 |
Date Submitted: |
8/15/2016 1:20:00 PM |
Created By: |
Simone Baumann-Pickering |
Date Last Modified: |
2/14/2017 12:53:00 PM |
URI Serial #: |
None |
Funding Agencies: |
INST/UCSD/SIO - NONE - Funded |
Summary of Field Work: |
We propose a science verification cruise (SVC) which will test a range of equipment and capabilities for mooring and acoustic work, exercising several winches, cranes, sonars, underway systems, and helping to characterize the underwater noise from the vessel impacting acoustic work. The cruise would contribute to ONR funded work within the Young Investigator Program (YIP) award to Simone Baumann-Pickering. Additionally, we propose to drag for a co-located lost NOAA mooring of Uwe Send’s group (in 4000m water depth). |
Summary of Facility Requirements: |
CTD (+winch), A-frame, MOCNESS (+winch) and Manta, davit for deployment of float, TSE winch for dragging, two air tuggers, weak links from 10-15K lbs, clamp on pinger, winch for acoustic array, antenna for sonobuoys, Simrad EK80 (all frequencies), auxiliary underway measurements as available |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1008929 |
Created By: |
Simone Baumann-Pickering |
Date Last Modified: |
2/14/2017 12:53:00 PM |
Date Submitted: |
8/15/2016 1:20:00 PM |
|
Year: |
2017
|
Ship/Facility: |
Sally Ride
|
Optimum Start Date:
|
2/6/2017 |
Dates to Avoid: |
CalCOFI 1/5-1/29 - equipment and personnel overlap 2/17-20, no public school (not critical to avoid) |
|
|
|
|
Earliest Start Date: |
3/3/2017 |
Multi-Ship Op: |
No |
Latest Start Date: |
3/8/2017 |
Other Ship(s): |
n/a |
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
5 |
2 |
1 |
0 |
8 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
n/a |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
n/a |
|
Short Description of Op Area
for use in schedules: |
CCE1 site |
Description of Op Area: |
CCE1 mooring site is located offshore in deep, pelagic waters (4000 m, 33°29.56N, 122°30.89W) of the core California Current |
Op Area Size/Dia.: |
50 |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
32.706783° N
/
117.236033° W
map
32° 42.40698' N
/
117° 14.16198' W
map
|
|
|
Ending
|
32.706783° N
/
117.236033° W
map
32° 42.40698' N
/
117° 14.16198' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
Yes |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
We'll be bringing a towed array and sonobuoys. Both will need ITAR clearance. |
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
San Diego, CA, USA |
None, |
San Diego, CA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
N/A |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Simone Baumann-Pickering, SIO |
# in Science Party |
12 |
# of different science teams |
2 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
Exact number will be determined as we get closer to the cruise date. |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
N/A
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
CTD (+winch), A-frame, MOCNESS (+winch) and Manta, davit for deployment of float, TSE winch for dragging, two air tuggers, weak links from 10-15K lbs, clamp on pinger, winch for acoustic array, antenna for sonobuoys, Simrad EK80 (all frequencies), auxiliary underway measurements as available |
|