| 
                                
                                    |  | MF Noise
                                         - 
                                        2019
                                         - 
                                        Sally Ride |  |  | 
                    
                    
                        | 
    
        | Project Title: | Mid-Frequency Noise | Project Status: | Submitted |  
        | Principal Investigator: | William S. Hodgkiss, SIO | Project Institution: | SIO |  
        | Project ID: | 105744 | Version #: | 2 |  
        | Date Submitted: | 3/20/2017 12:48:00 PM | Created By: | William S. Hodgkiss |  
        | Date Last Modified: | 6/11/2019 4:49:00 PM | URI Serial #: | None |  
        | Funding Agencies: | NAVY/ONR - NONE - Funded |  
        | Summary of Field Work: | Observations of mid-frequency ambient noise using a buoy-tethered acoustic array. |  
        | Summary of Facility Requirements: | Large A-frame and ample deck space for layout of array hardware on deck, 2-3 buoys, and 2 winches. CTD, ADCP, multi-beam, and subbottom profiler will be used. |  
        | Summary of other requirements and comments: |  |  | 
                    
                    
                        | 
                                
                                    | Type of Request: | Primary Ship Use | Request Status: | Submitted |  
                                    | Request ID: | 1009318 | Created By: | William S. Hodgkiss |  
                                    | Date Last Modified: | 7/3/2018 12:35:00 PM | Date Submitted: | 3/20/2017 12:48:00 PM |  | 
                    
                    
                        | 
                                
                                    | Year: | 2019 | Ship/Facility: | Sally Ride |  
                                    | Optimum Start Date: | 4/1/2019 | Dates to Avoid: | Weather is a consideration since deployment/recovery of the array hardware cannot be done in significant seas. |  
                                    |  | 
 |  | 
 |  
                                    | Earliest Start Date: | 3/1/2019 | Multi-Ship Op: | No |  
                                    | Latest Start Date: | 5/1/2019 | Other Ship(s): | N/A |  
                                
                                    | 
 |  
                                    | Operating Days Needed: | Science Days | Mob Days | De-Mob Days | Estimated Transit Days | Total Days |  
                                    | 12 | 2 | 2 | 4 | 20 |  
                                    | Repeating Cruise? (within same year)
 | No | Interval: |  | # of Cruises: |  |  
                                    | 
 |  
                                    | Description of Repeating cruise requirements: | N/A |  
                                    | Justification/Explanation for ship choice, dates, conflicts, number of days & multi-ship operations:
 | Sally Ride previously has been used to deploy hardware. Window of requested dates due to weather considerations. |  | 
                    
                    
                        | 
                                
                                    | 
									    
										  | Short Description of Op Area for use in schedules:
 | Philippine Sea |  
										  | Description of Op Area: | Approx 200 nm NW of Apra Harbor, Guam. Approximate location is 14-45N, 141-15E. |  
											| Op Area Size/Dia.: | Approx 75 nmi radius circle |  |  | 
	
		|  | Lat/Long | Marsden Grid | Navy Op Area |  
		| Beginning | 
				
					13° 26.4 ' N 
					/
					144 ° 39 ' E
					map |  |  |  
		| Ending | 
				
					13° 26.4 ' N 
					/
					144 ° 39 ' E
					map |  |  |  
	|  | Show Degrees Minutes |  |  |  |  | 
                    
                    
                        | 
                                
                                    | Foreign Clearance Required? | No | Coastal States: 
 |  
									|  Important Info on Foreign Research Clearances |  |  
                                    | Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
 
 | Yes | If yes, have you applied for the necessary permits through your export control office? | No |  
									|  Questions about ITAR/EAR regulations? |  
                                    | Comments about foreign clearance requirements or
 description of any other special permitting requirements
 (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.)
 | N/A |  | 
                    
                    
                        | 
                                
                                    | Requested Start Port | Intermediate Port(s) | Requested End Port |  
                                    | Apra Harbor, Guam | None, | Apra Harbor, Guam |  
                                    | Explanation/justification for requested ports and dates of intermediate stops
 or to list additional port stops
 | Port needs to be convenient for Philippine Sea experiment. |  
									| 
  Important Info on Working in Foreign Ports 
 
 |  |  | 
                    
                    
                        | 
                                
                                    | Chief Scientist: | William S. Hodgkiss, SIO |  
                                    | # in Science Party | 10 | # of different science teams | 1 | # Marine Technicians to be provided by ship operator:
 (include in science party total)
 
 | 2 |  
                                    | Explanation of Science Party Requirements and Technician Requirements | Science party includes technical support for the array hardware deployment/recovery and on-board quick-look analysis of recorded data. |  | 
                    
                    
                        | 
	
		|  Dynamic Positioning |  ADCP |  Multibeam |  Seismic |  
		|  Dredging/Coring/Large Dia. Trawl Wire |  Stern A-frame |  Fiber Optic (.681) |  0.680 Coax Wire |  
		|  SCUBA Diving |  Radioisotope use - briefly describe |  NO Radioisotope use/Natural level work |  Other Operator Provided Inst. - Describe |  
		| 2 PI-Provided Vans - briefly describe |  MOCNESS |  |  |  | 
                    
                        | 
                                
                                    | Explain Instrumentation or Capability requirements that could affect choice
 of ship in scheduling.
 | 
                                            A-frame for deployment of acoustic array and buoys. Hardware will be shipped in 1-2 20' containers but these do not need to be loaded on ship if they can be stored locally during the cruise. |  | 
                    
                    
                        |  | 
                    
                        | 
                                
                                    | Explain Major Ancillary Facilities Requirements and list description
 and provider for "other" systems.
 | N/A |  |