|
Mahi tagging in GOM
-
2018
-
F. G. Walton Smith
|
|
|
Project Title: |
Mahi mahi tagging in the Gulf of Mexico with static oil exposure |
Project Status: |
Submitted |
Principal Investigator: |
Lela Schlenker, RSMAS |
Project Institution: |
RSMAS |
Project ID: |
105954 |
Version #: |
1 |
Date Submitted: |
10/12/2017 1:52:00 PM |
Created By: |
Lela Schlenker |
Date Last Modified: |
10/12/2017 1:52:00 PM |
URI Serial #: |
None |
Funding Agencies: |
GOMRI - NONE - Funded |
Summary of Field Work: |
Working with a charter boat to catch mahi, transfer them to the Walton Smith, tag them, keep them in tanks, expose one group to crude oil, and release control and oil exposed fish back into the Gulf of Mexico |
Summary of Facility Requirements: |
Deck space for tanks and pump and side boom will need to be lowered for water intake with our pump |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1009623 |
Created By: |
Lela Schlenker |
Date Last Modified: |
10/12/2017 1:52:00 PM |
Date Submitted: |
10/12/2017 1:52:00 PM |
|
Year: |
2018
|
Ship/Facility: |
F. G. Walton Smith
|
Optimum Start Date:
|
7/19/2018 |
Dates to Avoid: |
July 1-8 for a conference our group will attend and July 15-19 for our PI's travel |
|
|
|
|
Earliest Start Date: |
5/1/2018 |
Multi-Ship Op: |
Yes |
Latest Start Date: |
8/1/2018 |
Other Ship(s): |
Will work with a small charter fishing vessel to catch mahi-mahi which will be transferred to the Walton Smith by casting a leader to their vessel. The two vessels will need to be within 20 meters of one another but no closer. No transfer of personnel will occur. |
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
6 |
1 |
1 |
6 |
14 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
|
|
Short Description of Op Area
for use in schedules: |
Gulf of Mexico |
Description of Op Area: |
Gulf of Mexico close to the site of the Deepwater Horizon oil spill |
Op Area Size/Dia.: |
50 |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
28.738056° N
/
88.365833° W
map
28° 44.28333' N
/
88° 21.95' W
map
|
|
|
Ending
|
28.738056° N
/
88.365833° W
map
28° 44.28333' N
/
88° 21.95' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Miami, FL, USA |
None |
Miami, FL, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
|
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Lela Schlenker, RSMAS |
# in Science Party |
12 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
One technician to operate the CTD |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
|
|