EPSI-FCTD ENG TEST
-
2018
-
Sally Ride
|
|
|
Project Title: |
EPSILOMETER-FCTD ENGINEERING TEST (NISKINE PROJECT) |
Project Status: |
Submitted |
Principal Investigator: |
Matthew H. Alford, SIO |
Project Institution: |
SIO |
Project ID: |
105962 |
Version #: |
7 |
Date Submitted: |
11/3/2017 8:05:00 PM |
Created By: |
sean lastuka |
Date Last Modified: |
4/27/2018 11:17:00 AM |
URI Serial #: |
None |
Funding Agencies: |
NAVY/ONR - NONE - Funded |
Summary of Field Work: |
THE CRUISE WILL BE A LOCAL (SAN DIEGO) ENGINEERING TEST FOR TWO NEW MULTI-SCALEW OCEAN DYNAMIC (MOD) GROUP INSTRUMENTS. ALL INSTRUMENTS WILL COLLECT CONDUCTIVITY, TEMPERATURE, DEPTH AND SHEAR/TURBULENCE DATA.
FCTD-EPSI: USE A CUSTOM DECK-MOUNTED WINCH/BOOM TO DEPLOY SMALL (50LB) DROPPING BODY TO A DEPTH OF 1000M. DEPLOYMENT WILL REPEAT EVERY 10 MINUTES FOR ABOUT 12-24HRS AT A TIME.
ALSO, DEPLOY 2-3 WIREWALKERS. WIREWALKERS ARE A SURFACE EXPRESSION WITH A 100LB PROFILER THAT TRAVELS UP AND DOWN A 100-300M LINE. THEY ARE TYPICALLY USED WITH AN ANCHOR TO PREVENT DRIFTING AND TO HOLD TENSION ON THE LINE. THEY ARE DEPLOYED AT THE BEGINNING OF THE CRUISE AND RECOVERED AT THE END OF THE CRUISE. |
Summary of Facility Requirements: |
WE WILL NEED THE CTD ROSETTE AS WELL AS DECK SPACE SUFFICIENT FOR MOUNTING OUR WINCH SYSTEM AND TEMPORARY SPACE FOR 2-3 WIREWALKER SYSTEMS. THE WIREWALKER SURFACE EXPRESSION IS ABOUT 3FT IN DIAMETER AND WEIGHTS ABOUT 150LB. |
Summary of other requirements and comments: |
UNFUNDED. SPONSOR HAS GUARANTEED FUNDS. |
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1009642 |
Created By: |
sean lastuka |
Date Last Modified: |
12/19/2017 6:06:00 PM |
Date Submitted: |
11/3/2017 10:13:00 PM |
|
Year: |
2018
|
Ship/Facility: |
Sally Ride
|
Optimum Start Date:
|
2/22/2018 |
Dates to Avoid: |
We would prefer these exact dates |
|
|
|
|
Earliest Start Date: |
2/22/2018 |
Multi-Ship Op: |
No |
Latest Start Date: |
2/23/2018 |
Other Ship(s): |
NA |
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
2 |
2 |
1 |
0 |
5 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
NA |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
NA |
|
Short Description of Op Area
for use in schedules: |
FCTD ENG TEST |
Description of Op Area: |
EPSILOMETER-FCTD ENGINEERING TEST |
Op Area Size/Dia.: |
5 |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
32.92° N
/
117.4135° W
map
32° 55.2' N
/
117° 24.81' W
map
|
|
|
Ending
|
32.92° N
/
117.4135° W
map
32° 55.2' N
/
117° 24.81' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
NA |
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
San Diego, CA, USA |
None, |
San Diego, CA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
RV Sally Ride is permanently moored at the Point Loma Nimitz Marine Facility (MARFAC). We will mob and demob at the facility. |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Matthew H. Alford, SIO |
# in Science Party |
8 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
NA |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
NA
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
NA |
|