Data Assimilation
-
2020
-
Roger Revelle
|
|
|
Project Title: |
Platform Centric ASW Processing with Through-the-Sensor Data Assimilation and Fusion |
Project Status: |
Submitted |
Principal Investigator: |
William S. Hodgkiss, SIO |
Project Institution: |
SIO |
Project ID: |
106358 |
Version #: |
3 |
Date Submitted: |
1/29/2019 2:54:00 PM |
Created By: |
William S. Hodgkiss |
Date Last Modified: |
5/14/2019 4:13:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NAVY/ONR - NONE - Funded |
Summary of Field Work: |
Observations of mid-frequency signal propagation and ambient noise using a buoy-tethered acoustic array. Simultaneous observations of the local physical oceanography and ocean surface wave field. |
Summary of Facility Requirements: |
Large A-frame and ample deck space for layout of array hardware, 3 buoys, 4 Wirewalkers, 2 wave gliders and 1-2 winches. CTD, ADCP, multi-beam, subbottom profiler, and WAMOS wave monitoring system will be used along with the HDSS Doppler sonar system. |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1010228 |
Created By: |
William S. Hodgkiss |
Date Last Modified: |
5/14/2019 4:13:00 PM |
Date Submitted: |
1/29/2019 2:54:00 PM |
|
Year: |
2020
|
Ship/Facility: |
Roger Revelle
|
Optimum Start Date:
|
4/1/2020 |
Dates to Avoid: |
Weather is a consideration since deployment/recovery of the array hardware cannot be done in significant seas. |
|
|
|
|
Earliest Start Date: |
3/1/2020 |
Multi-Ship Op: |
No |
Latest Start Date: |
5/1/2020 |
Other Ship(s): |
N/A |
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
20 |
3 |
1 |
2 |
26 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
N/A |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
Roger Revelle has the HDSS Doppler sonar system installed. Sally Ride previously has been used to deploy the acoustic array hardware. Window of requested dates due to weather considerations. |
|
Short Description of Op Area
for use in schedules: |
SoCal |
Description of Op Area: |
Approx 250 nm W of San Diego. Approximate location is 32N, 122W. |
Op Area Size/Dia.: |
Approx 100 nmi radius circle |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
32° 40.2' N
/
117° 13.8' W
map
|
|
|
Ending
|
32° 40.2' N
/
117° 13.8' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
US EEZ |
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
Yes |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
N/A |
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
San Diego, CA, USA |
None, |
San Diego, CA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
Port needs to be convenient for Philippine Sea experiment. |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
William S. Hodgkiss, SIO |
# in Science Party |
18 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
2 |
Explanation of Science Party Requirements and Technician Requirements |
Science party includes technical support for the acoustic array, Wirewalker, and wave glider hardware deployment/recovery and on-board quick-look analysis of recorded data. |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
3 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
A-frame for deployment of acoustic array and buoys. Hardware will be shipped in 2-3 20' containers but these do not need to be loaded on ship if they can be stored locally during the cruise.
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
N/A |
|