Summary of Field Work: |
need to consider if existing winches can be de-wired and used to recover our mooring and conduct pull test |
Summary of Facility Requirements: |
This cruise is only possible if the transit is funded by Bob Houtman (ONR) between Manila and Agra. The objective of this cruise is to deploy different 3 different anchors with instrumented down-lines and pull-test each. One mooring will remain in place with an instrumented buoy. Need to consider if existing winches can be de-wired and used to recover our mooring and conduct pull test. |
Summary of other requirements and comments: |
1. conduct ADCP and bottom survey in transit 2. on-site, deploy moored instrumented buoy and monitor, deploy an 2nd anchor, measure pull strenght, recover mooring line, deploy 3rd anchor and measure pull strenght. |
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1001716 |
Created By: |
Lee Shores |
Date Last Modified: |
11/14/2007 8:36:00 PM |
Date Submitted: |
|
|
Year: |
2008
|
Ship/Facility: |
Melville
|
Optimum Start Date:
|
3/9/2008 |
Dates to Avoid: |
|
|
|
|
|
Earliest Start Date: |
3/9/2008 |
Multi-Ship Op: |
No |
Latest Start Date: |
3/12/2008 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
13 |
0 |
0 |
0 |
13 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
|
|
Short Description of Op Area
for use in schedules: |
|
Description of Op Area: |
|
Op Area Size/Dia.: |
|
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
None |
None |
None |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
|
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Lee Shores, MAI_VA |
# in Science Party |
10 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
ADCP, met sensors, bottom survey, possible bottom cores |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
|
|