Deep Line Pack Test
-
2008
-
Point Sur
|
|
|
Project Title: |
Deep Water Line Pack Test |
Project Status: |
Submitted |
Principal Investigator: |
Lee Shores, MAI_VA |
Project Institution: |
MAI_VA |
Project ID: |
101754 |
Version #: |
2 |
Date Submitted: |
9/19/2008 8:18:00 AM |
Created By: |
Lee Shores |
Date Last Modified: |
12/3/2008 12:49:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NAVY/ONR - NONE - Funded |
Summary of Field Work: |
Test the ability of a line pack to deploy a mooring line in deep water without fouling. This cruise will test a re-design of a line pack use in Spring 08 on RV Melville. |
Summary of Facility Requirements: |
RV Pt Sur and home port facility |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1002443 |
Created By: |
Lee Shores |
Date Last Modified: |
9/19/2008 2:47:00 PM |
Date Submitted: |
9/19/2008 2:47:00 PM |
|
Year: |
2008
|
Ship/Facility: |
Point Sur
|
Optimum Start Date:
|
11/17/2008 |
Dates to Avoid: |
|
|
|
|
|
Earliest Start Date: |
11/17/2008 |
Multi-Ship Op: |
No |
Latest Start Date: |
11/17/2008 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
1 |
1 |
1 |
2 |
5 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
need ship on west coast as soon after 15 Nov 08 as possible to transit to 15,000 ft water depth, deploy line pack and return. |
|
Short Description of Op Area
for use in schedules: |
East Pac |
Description of Op Area: |
190 nm west of Moss Landing |
Op Area Size/Dia.: |
no fixed, 15,000 ft depth needed |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
35.851667° N
/
125.49° W
map
35° 51.10002' N
/
125° 29.4' W
map
|
|
|
Ending
|
35.851667° N
/
125.49° W
map
35° 51.10002' N
/
125° 29.4' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
None |
None |
None |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
Moss Landing to Moss Landing |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Lee Shores, MAI_VA |
# in Science Party |
4 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
science party 1 - CHief Scientist 2 - Lead Enginner 3 - Deck Operations 4 - Deck Operations
restec needed - operate crane, a-frame, fathometer, uw camera if equiped, daylight operations only |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
1. rig and lift 72" diameter donut shape line pack (2800 lbs)+anchor (200-300 lbs)+two acoustic releases+ u/w camera and cable over side using a-frame or crane
2. release anchor
3. observer line pack
4. recover line pack, transfer line to winch, recover line (20,000 ft)
Load, secure and power winch (characteristics TBD)
Load and secure drop weight (200-300 lbs)
Load and secure lab equipment (UW camera, acoustic releases, tool box, etc)
Depart Moss Landing in PM
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
|
|