|
Multicorer w/camera
-
2012
-
Melville
|
|
|
Project Title: |
Developing a Seafloor Sediment Multicorer With a Real-time Camera System for US Oceanographic Multidisciplinary Research |
Project Status: |
Submitted |
Principal Investigator: |
Daniel J. Fornari, WHOI |
Project Institution: |
WHOI |
Project ID: |
102638 |
Version #: |
3 |
Date Submitted: |
8/11/2010 12:22:00 PM |
Created By: |
Daniel J. Fornari |
Date Last Modified: |
2/25/2015 1:39:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NSF/OCE/IPS - 1061794 - Funded |
Summary of Field Work: |
Testing new multicorer with camera and CTD capability on both CTD 0.322" sea cable and fiber optic cable |
Summary of Facility Requirements: |
RV Melville and UNOLS 0.322" CTD cable and winch and mid-ships overboarding and fiber optic cable and portable FO winch to test FO multicorer system too |
Summary of other requirements and comments: |
WHOI-MISO facility instrumentation integrated with new multicorer NOTE - THIS IS A REQUEST FOR 2012 SHIP TIME TO MOVE THE 5 DAYS SCHEDULED IN 2011 ON NEW HORIZON TO MELVILLE BECAUSE NEW HORIZON CANNOT ACCOMMODATE EITHER THE CTD OR FIBEROPTIC CABLE REQUIREMENTS BECAUSE OF VERTICAL CLEARANCE LIMITATIONS - SEE EMAILS BETWEEN PIS AND SIO AND UNOLS AND NSF |
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1004040 |
Created By: |
Daniel J. Fornari |
Date Last Modified: |
8/24/2011 10:00:00 AM |
Date Submitted: |
8/11/2010 12:22:00 PM |
|
Year: |
2012
|
Ship/Facility: |
Melville
|
Optimum Start Date:
|
1/1/2012 |
Dates to Avoid: |
need good weather window offshore southern california - santa barbara basin |
|
|
|
|
Earliest Start Date: |
1/1/2012 |
Multi-Ship Op: |
No |
Latest Start Date: |
10/15/2012 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
3 |
2 |
1 |
2 |
8 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
|
|
Short Description of Op Area
for use in schedules: |
SB Basin |
Description of Op Area: |
Santa Barbara Basin |
Op Area Size/Dia.: |
30nm x 30 nm |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
34.266667° N
/
119.816667° W
map
34° 16.00002' N
/
119° 49.00002' W
map
|
|
|
Ending
|
34.266667° N
/
119.816667° W
map
34° 16.00002' N
/
119° 49.00002' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
San Diego, CA, USA |
None |
San Diego, CA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
|
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Daniel J. Fornari, WHOI |
# in Science Party |
6 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
2 |
Explanation of Science Party Requirements and Technician Requirements |
Need CTD and ResTech multicorer technical support from SIO |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
Need 0.322: UNOLS standard CTD cable and winch and sliprings and mid-ship overboarding WHOI-MISO will provide the multicorer with camera/CTD/water sampling system to be tested
Request for SIO to also supply a MC800 multicorer to be rigged for the fiber optic system to be tested using the SIO portable FO winch and cable
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
|
|