Oregon Profile ASCPR
-
2017
-
Thomas G. Thompson
|
|
|
Project Title: |
Collaborative Research: Constraints on Interseismic Deformation Offshore Oregon from Calibrated Continuous Pressure Records |
Project Status: |
Submitted |
Principal Investigator: |
William S. Wilcock, UW |
Project Institution: |
UW |
Project ID: |
104963 |
Version #: |
5 |
Date Submitted: |
8/6/2015 4:50:00 PM |
Created By: |
William S. Wilcock |
Date Last Modified: |
8/30/2016 3:24:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NSF/OCE/MGG - 1558477 - Funded |
Summary of Field Work: |
This work will comprise ROV measurements in two successive years to obtain calibrated absolute pressure measurements and data download from continuous bottom pressure recorders at 6 seafloor benchmarks that form a profile across the Cascadia subduction zone off central Oregon. |
Summary of Facility Requirements: |
Requires a Global class vessel with DP capability and a remotely operated vehicle |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1007970 |
Created By: |
William S. Wilcock |
Date Last Modified: |
8/30/2016 3:24:00 PM |
Date Submitted: |
8/6/2015 4:50:00 PM |
|
Year: |
2017
|
Ship/Facility: |
Thomas G. Thompson
|
Optimum Start Date:
|
8/1/2017 |
Dates to Avoid: |
I at all possible we request to go after the OOI cabled array (RSN) servicing cruise because going beforehand may impact the availability of UW APL engineering support for this cruise. It must come 2 months after the 2017 R/V Oceanus cruise |
|
|
|
|
Earliest Start Date: |
7/15/2017 |
Multi-Ship Op: |
No |
Latest Start Date: |
9/15/2017 |
Other Ship(s): |
N/A |
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
5 |
1 |
1 |
1 |
8 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
N/A |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
We need a ship that can handle Jason.
Number of science days requested are "days on site" |
|
Short Description of Op Area
for use in schedules: |
Oregon Margin |
Description of Op Area: |
Profile extending from shelf to abyssal plain (OOI cabled array slope base site) on the central Oregon margin |
Op Area Size/Dia.: |
1 |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
44° 30' N
/
125° 24' W
map
|
|
|
Ending
|
44° 24' N
/
124° 24' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
N/A |
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Newport, OR, USA |
None, , None, |
Newport, OR, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
The work area is very close to Newport |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
William S. Wilcock, UW |
# in Science Party |
12 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
ROV capable vessel |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
Nothing to add
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
Jason |
|