Enhance OOI at Axial
-
2017
-
Global
|
|
|
Project Title: |
Enhancements to the OOI Cabled Array at Axial Seamount |
Project Status: |
Submitted |
Principal Investigator: |
William W. Chadwick, OSU_HMSC |
Project Institution: |
OSU_HMSC |
Project ID: |
105195 |
Version #: |
1 |
Date Submitted: |
2/10/2016 12:20:00 PM |
Created By: |
William W. Chadwick |
Date Last Modified: |
7/5/2016 4:50:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NSF/OCE/MGG - 1634150 - Funded |
Summary of Field Work: |
This is mainly an equipment proposal to add instruments to the OOI Cabled Array at Axial Seamount, including one bottom-pressure tilt instrument and one CTD instrument. |
Summary of Facility Requirements: |
We request one day of ship and ROV time be added to the annual OOI Cabled Array Operations and Maintenance (O&M) cruise scheduled for summer of 2017 to accommodate deploying the bottom-pressure/tilt instrument. |
Summary of other requirements and comments: |
The NSF proposal science budget includes support costs for one day of extra time for the OOI Cable Array personnel on the O&M cruise. |
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1008311 |
Created By: |
William W. Chadwick |
Date Last Modified: |
2/10/2016 12:20:00 PM |
Date Submitted: |
2/10/2016 12:20:00 PM |
|
Year: |
2017
|
Ship/Facility: |
Global
|
Optimum Start Date:
|
7/1/2017 |
Dates to Avoid: |
n/a |
|
|
|
|
Earliest Start Date: |
6/1/2017 |
Multi-Ship Op: |
No |
Latest Start Date: |
9/1/2017 |
Other Ship(s): |
n/a |
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
1 |
0 |
0 |
0 |
1 |
Repeating Cruise?
(within same year) |
No |
Interval: |
n/a |
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
n/a |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
n/a |
|
Short Description of Op Area
for use in schedules: |
Axial Seamount |
Description of Op Area: |
The bottom-pressure tilt instrument will be deployed at the OOI Cabled Array node at the ASHES hydrothermal vent site. |
Op Area Size/Dia.: |
1 |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
n/a |
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Seattle, WA, USA |
None, , None, |
Seattle, WA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
n/a |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Deborah S. Kelley, UW |
# in Science Party |
1 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
No extra personnel are required beyond the regular OOI Cabled Array staff that will be on the O&M cruise. I have entered "1" in the science party boxes above, only because it would not accept "0". |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
n/a
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
The annual OOI Cabled Array O&M cruises require an ROV, presumably either Jason or ROPOS. |
|