|
Pito Deep Gabbros
-
2017
-
Roger Revelle
|
|
|
Project Title: |
Collaborative Research: Tracking the thermal and petrologic evolution of magmatically robust fast spread lower ocean crust |
Project Status: |
Submitted |
Principal Investigator: |
Michael J. Cheadle, UWYO |
Project Institution: |
UWYO |
Project ID: |
104498 |
Version #: |
2 |
Date Submitted: |
8/7/2014 2:30:00 PM |
Created By: |
Michael J. Cheadle |
Date Last Modified: |
3/16/2016 11:08:00 AM |
URI Serial #: |
None |
Funding Agencies: |
NSF/OCE/MGG - 1459462 - Funded |
Summary of Field Work: |
14 days of Jason II dives sampling rocks from a moderately steep slope and 10 days of Sentry dives mapping (sidescan) and collecting magnetic data. Plus setting up transponder networks in two areas and dredging during down time. Concurrent Jason II and Sentry operations for about 5 days, depending on weather conditions etc. |
Summary of Facility Requirements: |
Jason II and Sentry |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1007204 |
Created By: |
Michael J. Cheadle |
Date Last Modified: |
3/16/2016 11:08:00 AM |
Date Submitted: |
8/7/2014 2:30:00 PM |
|
Year: |
2017
|
Ship/Facility: |
Roger Revelle
|
Optimum Start Date:
|
2/1/2017 |
Dates to Avoid: |
. |
|
|
|
|
Earliest Start Date: |
12/6/2016 |
Multi-Ship Op: |
No |
Latest Start Date: |
4/1/2017 |
Other Ship(s): |
. |
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
25 |
2 |
1 |
11 |
39 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
. |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
Roger Revelle because main winch has a fibre optic cable so as to avoid having an 'on deck' winch (because we will be using both Sentry and Jason II and their associated vans). February/March preferred due to optimal weather conditions(although not a harsh weather environment) and lower shipping/travel costs. Total on site days is our best guess to complete Sentry & Jason II ops, including some overlapping operations. |
|
Short Description of Op Area
for use in schedules: |
Pito Deep |
Description of Op Area: |
Operations area consists of the west flank of two "horstblocks" in the Pito Deep. The flanks are moderately steep extending from 3000-6000m depth |
Op Area Size/Dia.: |
16nm x 13 nm |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
23.083333° S
/
111.833333° W
map
23° 4.99998' S
/
111° 49.99998' W
map
|
|
|
Ending
|
22.833333° S
/
112.166667° W
map
22° 49.99998' S
/
112° 10.00002' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
. |
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Isla de Pascua, Chile |
None, , None, |
Bahia de Valparaiso, Chile |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
Isla de Pascua (Easter Island) is very close to the operation area, but has limited port facilities. Valparaiso is a reasonably close major port. Longer transit at end of cruise will allow sample processing/curation, and preparation for shipping. |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Michael J. Cheadle, UWYO |
# in Science Party |
28 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
2 |
Explanation of Science Party Requirements and Technician Requirements |
We propose 9 scientists (including senior scientists thru graduate students) to man Jason II operations and dredging and rock sampling (3 teams of 3), and 3 scientists to carry out the Sentry/magnetics/sidescan operations (1 team). We also need a computer technician and a marine technician for dredging. An additional 9 NDSL persons are recommended for Jason operations and 5 NDSL persons arerecommended for Sentry operations. |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
Fibre optic cable on main winch allows more deck space on the Revelle
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
. |
|