View Schedule

or schedule as:
the schedule as:
  2009 - New Horizon  
Final Schedule
Final - ID #10639    Version #2 - 1/25/2010

Scheduling Contact(s)
Hannah Delapp shipsked*%*%*ucsd^%^%^edu (858) 534-2841

  Notes:  
  View Summary     Set Default Associated Cruises
Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:02 Jan 2009
Dep:07 Jan 2009
Arr:24 Jan 2009
Unload:25 Jan 2009
 
San Diego, CA, USA
San Diego, CA, USA
 
 /
NP09
NP09
 
 
 
39N/130W
39N/130W
 
  David Wolgast
  18/22
 
Project PI/Institution Project # Days/Agency/Status
CalCOFI - Ocean obse Tony Koslow/SIO Not Specified 15/NOAA/F
calibrate the EK-60 Tony Koslow/SIO Not Specified 1/INST-UCSD-SIO/F
LTER: Nonlinear Tran Mark D. Ohman/SIO 0417616 1/NSF-OCE-BIO/F
Southern California Ralf Goericke/SIO Not Specified 1/NOAA/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-koslow01/
Notes: Added one day for EK-60 calibration

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:29 Jan 2009
Dep:30 Jan 2009
Arr:07 Feb 2009
Unload:09 Feb 2009
 
San Diego, CA, USA
San Diego, CA, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
  William S. Hodgkiss
  5/7
 
Project PI/Institution Project # Days/Agency/Status
WAK/WH ONR William S. Hodgkiss/SIO Not Specified 5/NAVY-ONR/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-hodgkiss01/
Notes: 3 Cruises were carried out during this period: January 30-31, Feb 3-4 and Feb 7th.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:12 Feb 2009
Dep:12 Feb 2009
Arr:19 Apr 2009
Unload:19 Apr 2009
 
San Diego, CA, USA
San Diego, CA, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
Out of Service
  0/67
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:20 Apr 2009
Dep:22 Apr 2009
Arr:03 May 2009
Unload:05 May 2009
 
San Diego, CA, USA
San Diego, CA, USA
 
CalCOFI Lines/
NP09
NP09
 
 
 
34N/120W
33N/121W
 
  Michael Stukel
  12/16
 
Project PI/Institution Project # Days/Agency/Status
Production Processes Michael Stukel/FSU Not Specified 12/INST-UCSD-SIO/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-stukel/
Notes: Sailed as scheduled returned to port evening of 4/22 due to CTD problems. Sailed the next day.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:06 May 2009
Dep:06 May 2009
Arr:11 May 2009
Unload:11 May 2009
 
San Diego, CA, USA
Newport, OR, USA
 
 /
NP09
NP09
 
 
 
32N/117W
44N/124W
 
 
Transit
  6/6
 
Project PI/Institution Project # Days/Agency/Status
transit to Newport Not Specified 6/NSF-OCE-EDU/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-transit01/
Notes: ~ 90 hrs transit

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:11 May 2009
Dep:12 May 2009
Arr:29 May 2009
Unload:30 May 2009
 
Newport, OR, USA
Newport, OR, USA
 
 /
NP09
NP09
 
 
 
45N/125W
45N/125W
 
  Byron Crump
  18/19
 
Project PI/Institution Project # Days/Agency/Status
S&TC-Coastal Margin Antonio Baptista/OGI OCE 0424602 19/NSF-OCE-OTIC/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-baptista01/
Notes: Requesting 0800 departure. Need one day to load. (Tie up at Port Westward (Beaver Army Dock) late afternoon of May 13 and depart the morning of May 14). Intermediate stops at Job Corps dock in Astoria on May 21 and possibly May 26 (waiting approval). All scientific load out to take place in Newport. Offload on arrival day.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:30 May 2009
Dep:30 May 2009
Arr:03 Jun 2009
Unload:03 Jun 2009
 
Newport, OR, USA
San Diego, CA, USA
 
 /
NP09
NP09
 
 
 
44N/124W
32N/117W
 
 
Transit
  4/4
 
Project PI/Institution Project # Days/Agency/Status
transit from Newport Not Specified 4/NSF-OCE-EDU/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-transit02/
Notes: Departure will take place in the afternoon after scientific offload.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:04 Jun 2009
Dep:04 Jun 2009
Arr:04 Jun 2009
Unload:21 Jul 2009
 
San Diego, CA, USA
San Diego, CA, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
Available for Service
  0/47
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:22 Jul 2009
Dep:24 Jul 2009
Arr:28 Jul 2009
Unload:29 Jul 2009
 
San Diego, CA, USA
San Diego, CA, USA
 
 /
NP09
NP09
 
 
 
39N/130W
39N/130W
 
  Curtis A. Collins
  5/8
 
Project PI/Institution Project # Days/Agency/Status
OC3570 Student Cruis Curtis A. Collins/NPS Not Specified 5/NAVY-NPS/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-collins/
Notes: Requests complete overlap with John Hildebrand cruise on R/V R.G. Sproul.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:31 Jul 2009
Dep:02 Aug 2009
Arr:21 Aug 2009
Unload:21 Aug 2009
 
San Diego, CA, USA
Newport, OR, USA
 
 /
NP09
 
 
 
 
35N/138W
0N/0E
 
  Miriam Goldstein
  20/22
 
Project PI/Institution Project # Days/Agency/Status
Debris @ NP Gyre Miriam Goldstein/SIO Not Specified 10/INST-UCSD-SIO/F
Project Kaisei Not Specified 7/OTHER/F
transit Not Specified 3/NSF-OCE-EDU/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-goldstein/

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:22 Aug 2009
Dep:22 Aug 2009
Arr:26 Aug 2009
Unload:26 Aug 2009
 
Newport, OR, USA
Newport, OR, USA
 
Offshore Oregon/
NP09
NP09
 
 
 
45N/124W
45N/125W
 
  Steven Constable
  5/5
 
Project PI/Institution Project # Days/Agency/Status
Design, Develop, and Steven Constable/SIO Not Specified 5/OTHER/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-constable/
Notes: Gear will be coming off Revelle ~ 27 June from Australia.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:27 Aug 2009
Dep:29 Aug 2009
Arr:11 Sep 2009
Unload:11 Sep 2009
 
Newport, OR, USA
Newport, OR, USA
 
Columbia River/
 
 
 
 
 
0N/0E
0N/0E
 
  Tawnya D. Peterson
  14/16
 
Project PI/Institution Project # Days/Agency/Status
S&TC-Coastal Margin Antonio Baptista/OGI OCE 0424602 16/NSF-OCE-OTIC/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-baptista02/
Notes: Two ship ops with Pt. Sur

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:11 Sep 2009
Dep:11 Sep 2009
Arr:15 Sep 2009
Unload:15 Sep 2009
 
Newport, OR, USA
San Diego, CA, USA
 
 /
NP09
NP09
 
 
 
32N/117W
44N/124W
 
 
Transit
  4/4
 
Project PI/Institution Project # Days/Agency/Status
transit Not Specified 4/NSF-OCE-EDU/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-transit03/

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:16 Sep 2009
Dep:16 Sep 2009
Arr:24 Sep 2009
Unload:24 Sep 2009
 
San Diego, CA, USA
San Diego, CA, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
Maintenance
  0/0
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: AC unit repairs

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:22 Sep 2009
Dep:25 Sep 2009
Arr:28 Sep 2009
Unload:29 Sep 2009
 
San Diego, CA, USA
San Diego, CA, USA
 
 /
NP09
NP09
 
 
 
33N/117W
33N/117W
 
  Lauren Rafelski
  4/8
 
Project PI/Institution Project # Days/Agency/Status
Development of in Ralph F. Keeling/SIO 0421546 4/NSF-OCE-IPS/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-keeling/
Notes: carry forward- NSF no-cost extension approved. Ship time reduces from 14 to 6 days per L. Goad.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:30 Sep 2009
Dep:02 Oct 2009
Arr:12 Oct 2009
Unload:13 Oct 2009
 
San Diego, CA, USA
Mazatlan, Mexico
 
 /
NP09
NP13
 
 
 
33N/117W
23N/106W
 
  Jared Kluesner
  11/14

Clearances: Mexico(A)
 
Project PI/Institution Project # Days/Agency/Status
Geological Sampling Jared Kluesner/SIO Not Specified 7/INST-UCSD-SIO/F
(from Berelson) Not Specified 4/NSF-OCE-EDU/F
Development of in Ralph F. Keeling/SIO 0421546 1/NSF-OCE-IPS/F
Geological Sampling Jared Kluesner/SIO Not Specified 0/OTHER/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-kluesner/

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:14 Oct 2009
Dep:14 Oct 2009
Arr:27 Oct 2009
Unload:30 Oct 2009
 
Mazatlan, Mexico
San Diego, CA, USA
 
 /
NP09
NP13
 
 
 
34N/118W
22N/115W
 
  William Berelson
  14/17

Clearances: Mexico(A)
 
Project PI/Institution Project # Days/Agency/Status
Non-local bacterial William Berelson/USC 0727123 14/NSF-OCE-BIO/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-berelson/

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:31 Oct 2009
Dep:31 Oct 2009
Arr:31 Oct 2009
Unload:02 Nov 2009
 
San Diego, CA, USA
San Diego, CA, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
  Lisa A. Levin
  1/2
 
Project PI/Institution Project # Days/Agency/Status
Deep-Sea Bio Lisa A. Levin/SIO UC Ship Funds 1/INST-UCSD-SIO/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-levin/

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Nov 2009
Dep:01 Nov 2009
Arr:01 Nov 2009
Unload:02 Nov 2009
 
San Diego, CA, USA
 
 
West of Pt Loma/
NP09
NP09
 
 
 
33N/117W
33N/117W
 
  Peter J. Franks
  1/1
 
Project PI/Institution Project # Days/Agency/Status
SIO280 Peter J. Franks/SIO Not Specified 1/INST-UCSD-SIO/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-franks/

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:03 Nov 2009
Dep:06 Nov 2009
Arr:23 Nov 2009
Unload:24 Nov 2009
 
San Diego, CA, USA
San Diego, CA, USA
 
 /
NP09
NP09
 
 
 
39N/130W
39N/130W
 
  Jennifer Rodgers-Wolgast
  18/22
 
Project PI/Institution Project # Days/Agency/Status
CalCOFI - Ocean obse Tony Koslow/SIO Not Specified 16/NOAA/F
LTER: Nonlinear Tran Mark D. Ohman/SIO 0417616 2/NSF-OCE-BIO/F
Southern California Ralf Goericke/SIO Not Specified 0/NOAA/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-koslow02/
Notes: .680 wire spooling (to be shipped to Melville) to be done during sci. loading

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Dec 2009
Dep:01 Dec 2009
Arr:01 Dec 2009
Unload:01 Dec 2009
 
San Diego, CA, USA
San Diego, CA, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
Maintenance
  1/1
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: ABS Inspection

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:04 Dec 2009
Dep:05 Dec 2009
Arr:08 Dec 2009
Unload:09 Dec 2009
 
San Diego, CA, USA
San Diego, CA, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
  Lee Tretbar
  4/6
 
Project PI/Institution Project # Days/Agency/Status
DART Karen Grissom/NOAA_NDBC Not Specified 4/NOAA-NWS-NDBC/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-grissom/
Notes: If it possible to conduct the recovery portion of the schedule, the plan is to leave the last station at dusk on the 7th. The group plans to offload on the 8th.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:11 Dec 2009
Dep:12 Dec 2009
Arr:20 Dec 2009
Unload:22 Dec 2009
 
San Diego, CA, USA
San Diego, CA, USA
 
Line 66 and 90/
NP09
NP09
 
 
 
32N/117W
32N/117W
 
  Uwe Send
  9/12
 
Project PI/Institution Project # Days/Agency/Status
CORC Uwe Send/SIO NA17RJ1231 5/NOAA/F
Nonlinear transition Mark D. Ohman/SIO 0841424 2/NSF-OCE-BIO/F
NOAA-CCE Uwe Send/SIO Not Specified 2/NOAA/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-send02/
Notes: Flexible start date to be determined by weather.
Agency   Funded   Pending   Total
INST   32   0   32
NAVY   10   0   10
NOAA   43   0   43
NSF   80   0   80
OTHER   12   0   12
Total  177 0 177
<
<